İstinye Park Shopping Mall

GEOTECHNICAL SYSTEMS

 

Project:

İstinye Park Shopping Mall, Izmir, Turkey
Permanent micropile execution for shopping mall construction

 

Contractor:
ZETAŞ Zemin Teknolojisi

 

Supplier:

SAS Steel Turkey

 

Construction period:
April 2016 – September 2017

 

Scope of supply:
 4700 pcs of DCP coated thread bar SAS 950/1050 f47mm with a total weight of 650 tons for micro pile system. 60.000 pcs of required accesories like anchor nuts, lock nuts, couplers, corrugated sheating, spacers, etc. 

 

Application:    

SAS thread bars used as micropiles under the building to protect the foundation against uplist forces due to high water uplift pressure. Concerning to the aggressive environment conditions the long term durability will be ensured by a double corrosion protection assembly. Therefore the SAS thread bar is placed in a corrugated sheathing pre-grouted by the contractor. So the SAS System can also be used for tensile loading in a durable application.

Cookie settings

We automatically set only technically necessary cookies the data of which we do not pass on and use exclusively for providing the functionality of this site.

We also use cookies which monitor your behaviour when visiting the web sites to get know the interests of our visitors better. We only collect pseudonym data; we do not identify your person.

Further information can be found in our privacy policy.